Adventures in Building an Experimental Aircraft
Ethan's RV-7
More Inventory (6/11/10)
- Leave a Comment

Search Construction Log
Hobbs Meter
706.8 Hours Worked As of 5/11/12
Construction Log
- Construction (375)
- Empennage (97)
- Elevators (39)
- Horizontal Stabilizer (27)
- Rudder (19)
- Vertical Stabilizer (15)
- Fuselage (63)
- Aft Fuselage (21)
- Bulkheads (17)
- Center Fuselage (12)
- Firewall (10)
- Longerons (4)
- Panel/Wiring (4)
- Wings (212)
- Ailerons (22)
- Flaps (20)
- Fuel Tanks (48)
- Leading Edges (27)
- Main Structure (74)
- Spars (19)
- Wingtips (23)
- Empennage (97)
- Preparation (34)
- Random Stuff (6)
- Construction (375)
What I’m Up To
- Center Fuselage Disassmebled (5/11/12)
- Aileron Trim Bracket (5/8/12)
- Crotch Strap Brackets (5/6/12)
- More Center Fuselage Skeleton Work (4/19/12)
- F-623 Corner Ribs Fit and Drilled (4/17/12)
- Center Fuselage Bottom Skin (4/15/12)
- Center Fuselage Prep Started (4/14/12)
- Aft Fuselsage Riveting Done…For Now (4/11/12)
- Seat Rib Work and a Little More Riveting (4/9/12)
- Aft Fuselage Riveting Day 6 Plus Seat Rib Modification (4/8/12)
Hits
- 33,417 since June 2009










