Finishing the Tie-Downs (6/27/10)

1.5 Hours -

After a little more work on the tie-down assemblies, they are essentially finished.

I started by drilling four platenuts to the right assembly.  These are used for bolts that will hold the elevator horn brackets, as well as the tie-down and spacers, to the spar.  Once this was done, I moved on to the left tie-down, where I still had to match drill it to the spar and drill the platenuts.

A platenut jig probably would have been easier, but a bolt and a cleco worked well too.

With everything drilled, it was time for that fun process of finishing the edges, scuffing with a Scotchbrite pad, cleaning with acetone, and priming.  I left the primer to dry overnight.  Tomorrow, I’ll rivet together the tie-down assemblies and bolt them to the spar.

More priming!

, ,

  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.