Left Tank Prep Continued (10/30/10)

1.7 Hours -

Most of the time I spent on the airplane today was used to dimple the left tank skin.  Hammering away on the c-frame with a mallet is a fairly slow process.

A picture of me dimpling the left tank skin.

After the skin was dimpled, I partially assembled the tank so that I could fabricate the vent line.

Fabricating the left tank's vent line.

The Rolo-Flair is a little awkward to use...clamping it in the vise gives me an extra hand.

, , , , ,

  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.