1.3 Hours -
Not much to report tonight. All I did was work on the final prep of the left leading edge ribs. These needed to be deburred, dimpled, scuffed, cleaned and primed.

Yes, another priming picture.
Like this:
Be the first to like this post.
leading edge, leading edge rib, priming, RV-7A, Wings
This entry was posted on December 3, 2010, 23:18 and is filed under Construction, Leading Edges, Wings. You can follow any responses to this entry through RSS 2.0.
You can skip to the end and leave a response. Pinging is currently not allowed.