- Aft Fuselage Final-Drilled (2/20/12)
- J-Channels Drilled (2/18/12)
- More Aft Fuselage Work (2/17/12)
- Aft Fuselage Clecoed (2/11/12)
- Aft Fuselage Initial Assembly Started (2/9/12)
- Tail Spring Mount Work (2/5/12)
- Longeron Bending Finished (2/4/12)
- Aft Canopy Decks Drilled and Trimmed (1/29/12)
- Longerons Started (1/28/12)
- Bulkheads Finished (1/22/12)
- F-711 and F-712 Bulkheads Started (1/21/12)
- F-706 Finally Done, F-711 Started (1/19/12)
- F-706 Again And Still Not Done (1/18/12)
- F-706, F-709 and F-710 Bulkhead Work (1/16/12)
- F-706 Bulkhead Work (1/15/12)
- F-706, F-707, F-708 Bulkheads Continued (1/14/12)
- F-706, F-707, and F-708 Bulkheads Started (1/5/12)
- F-705 Bulkhead Riveted (1/4/12)
- More F-705 Bulkhead Work (1/2/12)
- F-705 Bulkhead Continued (1/1/12)
- Seat Belt Anchors Installed (12/31/11)
- F-705 Bulkhead Started (12/30/11)
- F-704 Bulkhead Finished For Now (12/29/11)
- Misc. F-704 Bulkhead Work (12/28/11)
- F-704 Bulkhead and Control Column Work (12/27/11)
- Firewall Finished, F-704 Bulkhead Started (12/26/11)
- Firewall Riveting Started (12/24/11)
- Firewall Parts Primed (12/23/11)
- Firewall Countersinking Finished (12/21/11)
- Firewall Dimpling/Countersinking Started (12/20/11)
- New F-601J Made and More Firewall Deburring (12/19/11)
- Firewall Deburring (12/18/11)
- Firewall Drilled and Ready For Deburring (12/17/11)
- Firewall Assembly Started (12/16/11)
- Fuselage Inventory Complete (12/15/11)
- More Fuselage Inventory…Again (12/13/11)
- More Fuselage Inventory (12/12/11)
- Fuselage Inventory Continued (12/11/11)
- Fuselage Unpacking Finished, Inventory Started (12/10/11)
- Fuselage Kit Delivered (12/7/11)
- Wings Complete!!! (12/4/11)
- Right Wing Finished (12/3/11)
- Wings Done…Almost (12/2/11)
- More Left Bottom Skin Riveting (11/30/11)
- Left Bottom Wing Skin Riveting Continued (11/29/11)
- Finished Riveting Right Wing! (11/27/11)
- Outboard Bottom Skin Riveting Started (11/25/11)
- Right Landing Light Installed (11/5/11)
- Left Landing Light Finished (11/3/11)
- Left Landing Light Continued (10/26/11)
- Deburred Landing Light Parts (10/25/11)
- Left Landing/Taxi Light Started (10/23/11)
- Preparing to Rivet Last Bottom Skins (10/22/11)
- Wing Access Covers Finished (10/20/11)
- LED Drivers For Nav Lights Installed (10/18/11)
- Fuselage Kit Ordered! (10/8/11)
- Left Nav/Strobe Installed In Tip (8/20/11)
- Right Wingtip Finished (8/7/11)
- Right Wingtip Prep Continued (8/6/11)
- Left Wingtip Finished, Right Started (7/31/11)
- Left Wingtip Final Prep Started (7/25/11)
- Left Wingtip Match Drilled To Wing (7/24/11)
- Left Wingtip Initial Fit (7/23/11)
- Wingtip Lenses Continued (7/21/11)
- Wingtip Lens Work (7/17/11)
- Wingtip Nav/Strobe Lights Finished (7/16/11)
- Right Nav LEDs Wired (7/14/11)
- Wingtip Cutout Work (7/10/11)
- Left Flap Hinge and Left Nav Lights Completed (7/3/11)
- Left Nav Lights Positioned and Soldered (6/29/11)
- Right Flap Hinge Pin Retainer Finished (6/27/11)
- Right Flap Hinge Riveted to Wing (6/26/11)
- Left Wingtip and Left Flap Work (6/25/11)
- Wingtips Continued (6/22/11)
- More Wingtip Work and Right Flap Installed (6/12/11)
- Misc. Wing Work (6/8/11)
- Playing With LEDs (5/28/11)
- Vacation (5/14/11-5/22/11)
- Pushrods Finished (5/8/11)
- More Pushrod Work (5/7/11)
- Aileron Pushrods Continued (5/6/11)
- Aileron Pushrods Started (5/3/11)
- Right Flap Finished (5/1/11)
- Right Flap Final Prep Finished (4/22/11)
- Right Flap Top Skin Prep (4/21/11)
- More Right Flap Final Prep and Riveting (4/17/11)
- Right Flap Final Prep Started (4/16/11)
- Right Flap Drilled (4/6/11)
- Left Flap Finished (4/5/11)
- Left Flap Riveting Started (4/3/11)
- Left Flap Work…Again (3/30/11)
- More Left Flap Work and Aileron Installation (3/27/11)
- Left Flap Continued (3/26/11)
- Left Flap Skins and Hinge (3/23/11)
- Left Flap Work (3/21/11)
- Flaps Started (3/20/11)
- Ailerons Finished (3/17/11)
- Right Aileron Almost Finished (3/15/11)
- A Little Aileron Riveting (3/13/11)
- Left Aileron Prep Finished/Assembly Started (3/12/11)
- Started Deburring Left Aileron Parts (3/10/11)
- Right Aileron Final Assembly Started (3/9/11)
- Right Aileron Work (3/6/11)
- More Aileron Work (3/4/11)
- Left Aileron Drilled (3/2/11)
- Aileron Spar Reinforcement Plates Riveted (3/1/11)
- Aileron Spar Prep Continued (2/27/11)
- Aileron Stiffeners Riveted, Spars Started (2/26/11)
- Aileron Stiffeners Primed (2/25/11)
- Aileron Stiffener Work (2/24/11)
- Aileron Stiffener Fabrication Finished (2/21/11)
- Started Aileron Stiffeners (2/20/11)
- Skin Prep Finished and Pitot Tube Assembled (2/19/11)
- More Bottom Skin Work (2/18/11)
- Bottom Skin Work Continued (2/17/11)
- More Bottom Skin Work (2/13/11)
- Started Riveting Right Inboard Bottom Skin (1/30/11)
- Finished Riveting Left Bottom Inboard Skin (1/28/11)
- Tailwheel Endorsed (1/21/11-1/22/11)
- Started Riveting Bottom Wing Skins (1/20/11)
- Bottom Inboard Skin Prep (1/17/11)
- Started Bottom Skin Prep (1/16/11)
- Riveted Flap Braces and Aileron Gap Seals (1/15/11)
- Countersunk Flap Braces (1/14/11)
- Deburring, a Little Dimpling and Some Countersinking (1/13/11)
- Flap Brace and Aileron Gap Seal Deburring (1/12/11)
- Flap Brace and Aileron Gap Seal Work (1/11/11)
- Flap Braces and Aileron Gap Seals Drilled (1/10/11)
- Wings In Cradle, Aileron Brackets, and More (1/9/11)
- Wing Cradle Construction Part 3 (1/8/11)
- Wing Cradle Construction Part 2 (1/6/11)
- Wing Cradle Construction Part 1 (1/4/11)
- Wing Skin Riveting Part 3 (1/3/11)
- Wing Skin Riveting Part 2 (1/2/11)
- Wing Skin Riveting (1/1/11)
- The Right Tank Is Leak Free! (12/31/10)
- Aileron Bracket Assembly (12/30/10)
- Right Fuel Tank Re-Sealed (12/29/10)
- More Skin Prep (12/28/10)
- Right Wing Skin Prep (12/27/10)
- More Fuel Tank Work and Right Wing Prep (12/26/2010)
- Right Fuel Tank Repair Continued Part 3 (12/25/10)
- Right Fuel Tank Repair Continued Part 2 (12/24/10)
- Right Fuel Tank Repair Continued (12/23/10)
- Started Right Fuel Tank Repair (12/21/10)
- More Work on Left Top Wing Skins (12/19/10)
- Left Wing Top Skin Prep (12/18/10)
- The Left Wing Has a Complete Leading Edge (12/16/10)
- Left Tank On Wing (12/14/10)
- Riveted Right Leading Edge to Spar (12/13/10)
- Leading Edge Riveting/Left Fuel Tank Test (12/12/10)
- Still More Leading Edge and Wing Prep (12/11/10)
- More Countersinking and Wing Prep (12/10/10)
- More Spar Countersinking (12/6/10)
- Leading Edge and Spar Work (12/5/10)
- More Left Leading Edge Work (12/4/10)
- Left Leading Edge Rib Final Prep (12/3/10)
- Left Leading Edge Skin Prep (12/2/10)
- Stall Warner Assembly (12/1/10)
- Leading Edge Work (11/28/10)
- Burnet CAF Museum
- Where To Put The Third Wheel (11/27/10)
- Right Leading Edge Final Prep (11/26/10)
- Right Tank Leak Test Take 2 and Back to the Leading Edges (11/25/10)
- Left Tank Closed (11/22/10)
- Left Tank Baffle Riveted (11/21/10)
- Left Inboard Tank Rib Riveted (11/20/10)
- Test Fit Left Fuel Sender, Float, and Vent Line (11/17/10)
- Only One Rib Left In the Left Tank (11/14/10)
- Two More Ribs In Left Tank (11/7/10)
- Lackland Airfest 2010
- Outboard Rib Riveted In Left Tank (11/3/10)
- First Rib Riveted in Left Tank (11/2/10)
- Right Tank Tested; Left Tank Riveting Started (10/31/10)
- Left Tank Prep Continued (10/30/10)
- Left Tank Skin Deburred (10/29/10)
- Right Tank Access Cover and Sending Unit Sealed (10/27/10)
- Right Tank Baffled! (10/26/10)
- Final Prep of Right Tank Baffle (10/25/10)
- Right Tank Final Checks (10/24/10)
- Right Fuel Tank Inboard Rib Work (10/23/10)
- Outboard Rib Riveted Into Right Tank (10/22/10)
- Final Interior Rib Riveted in Right Tank (10/20/10)
- Two More Ribs Riveted (10/17/10)
- Second Rib Riveted (10/16/10)
- First Tank Rib Riveted (10/16/10)
- Right Tank Ribs Ready for Riveting (10/12/10)
- Right Tank Final Assembly Started (10/10/10)
- Right Tank Skin Deburred/Dimpled (10/9/10)
- Right Tank Final Prep Part 3 (10/6/10)
- More Right Tank Prep (10/4/10)
- Tank Final Prep Started (10/2/10)
- Finished Attach Brackets and Reinforcement Plates (9/28/10)
- Continued Drilling Right Tank and Started Attach Angles (9/26/10)
- Right Fuel Tank Work (9/25/10)
- Drilled Tank Stiffeners to Skins (9/24/10)
- Parker Rolo-Flair
- Prepped Right Tank Ribs (9/22/10)
- Tank Stiffeners Deburred (9/20/10)
- More Work on the Left Tank (9/19/10)
- Left Fuel Tank Work (9/18/10)
- Continued Z-Brackets and Started Working on Left Tank Ribs (9/12/10)
- Started Fuel Tank Z-Brackets (9/11/10)
- Leading Edges Finished…For Now (9/6/10)
- Leading Edges Are On The Wings (9/5/10)
- Trying To Get the Leading Edges on the Wings (9/4/10)
- More Leading Edge Rib Deburring (9/3/10)
- Leading Edge Ribs (9/2/10)
- Skins Drilled, Leading Edges Started (9/1/10)
- Continued Drilling Wing Skins (8/31/10)
- Drilled Top Skins On Right Wing (8/26/10)
- Leveled Wings and Started Fitting Skins (8/22/10)
- Leveling Wings Part 1 (8/21/10)
- Finished Wing Walk Doublers (8/19/10)
- Started Wing Walk Doublers (8/17/10)
- Riveted Right Aft Spar (8/16/10)
- Riveting Ribs To Spars (8/15/10)
- Cleaned and Primed Right Wing Ribs (8/11/10)
- Deburred/Scuffed Right Wing Ribs (8/9/10)
- Left Ribs Riveted To Main Spar (8/8/10)
- Primed and Started Riveting Left Wing Ribs (8/7/10)
- Scuffed Left Ribs (8/6/10)
- Drilled Pitot/AOA Holes In Ribs (8/1/10)
- Drilled Ribs To Spars (7/31/10)
- Right Wing Spar On Stand (7/27/10)
- Fixed Outboard Wing Stand Attachment (7/26/10)
- Conduit Holes Drilled (7/25/10)
- Main Wing Rib Prepped (7/24/10)
- Still More Rib Work (7/21/10)
- More Rib Work (7/19/10)
- Started Deburring and Fluting Wing Ribs (7/18/10)
- Rear Spars Assembled (7/17/10)
- Prepped and Primed Right Rear Spar (7/14/10)
- Drilling and Prepping Rear Spar Components (7/11/10)
- More Deburring of Rear Spar Components (7/5/10)
- Rear Spars Started (7/4/10)
- Tie-Down Assemblies Bolted to Spars (7/1/10)
- Finishing the Tie-Downs (6/27/10)
- Tie-Down Assemblies Started (6/26/10)
- Right Spar Platenuts Finished (6/25/10)
- Started the Right Spar (6/20/10)
- Left Spar Countersunk? (6/19/10)
- A Couple More Platenuts and Some Primer (6/18/10)
- More Countersinking on the Left Spar
- Countersinking Left Spar (6/15/10)
- Started Drilling Left Spar (6/13/10)
- Wing Inventory Complete (6/13/10)
- More Wing Inventory (6/12/10)
- More Inventory (6/11/10)
- Wing Kit Delivered (6/9/10)
- Continuing the Landing Lights (6/9/10)
- Started Wingtip Landing/Taxi Lights (6/6/10)
- Rudder Stop Installed (5/25/10)
- Internal Rudder Stop
- Pitot-Static System
- Horizontal Stabilizer Tips Finished and Riveted (5/13/10)
- A Few New Tools for the Wings
- Redoing The HS Tips (5/9/10)
- Primed Horizontal Stabilizer Tips (4/28/10)
- Vertical Stabilizer Tip Finished (4/24/10)
- Still Working On The VS and HS Tips (4/23/10)
- More Work On The Horizontal Stabilizer Tips (4/21/10)
- Horizontal Stabilizer Tip Rib Work (4/18/10)
- Started Right Horizontal Stabilizer Tip (4/16/10)
- Vertical Stabilizer Tip Done…For Now (4/16/10)
- Panel Planning/Dreaming
- Vertical Stabilizer Tip Part 3 (4/14/10)
- More Vertical Stabilizer Tip Work (4/11/10)
- Started Working On The Vertical Stabilizer Tip (4/9/10)
- Top Rudder Tip Installed (4/3/10)
- Left Elevator Tip Installed (3/30/10)
- Right Elevator Tip Installed (3/28/10)
- My First Wing Component Arrived (3/26/10)
- Wing Stand Construction Part 5 (3/25/10)
- Still More Wing Stand Construction (3/22/10)
- Wing Stand Construction Part 3 (3/17/10)
- More Wing Stand Construction (3/15/10)
- Started Building Wing Stands (3/13/10)
- Elevator Horns Drilled to Center Bearing (3/13/10)
- Fit Elevators to Horizontal Stabilizer (3/7/10)
- Finished Elevator Leading Edges (3/4/10)
- Left Elevator Leading Edge Rolled (3/2/10)
- More Trim Work (3/1/10)
- Finishing the Left Elevator (2/27/10)
- Ideal Stripmaster
- Final Assembly Started On Left Elevator (2/25/10)
- Finished Trim Tab and Ordered Parts From “The List” (2/21/10)
- Wing Kit Ordered (2/21/10)
- Trim Servo Installation (2/20/10)
- Trim Tab Bends Completed (2/15/10)
- Trim Tab Started (2/14/10)
- Bent Left Elevator Tabs (2/7/10)
- Left Elevator Skeleton Riveted (2/6/10)
- Left Elevator Skin Finished (2/3/10)
- Left Elevator Skeleton Ready For Assembly (2/2/10)
- Deburr, Dimple, Countersink, etc. (2/1/10)
- Left Elevator Continued (1/31/10)
- Continuing the Left Elevator (1/30/10)
- Left Elevator Skeleton Started (1/28/10)
- A Different Kind of Homebuilt (1/26/10)
- Right Elevator Done…Almost (1/25/10)
- Started Right Elevator Final Assembly (1/24/10)
- Right Elevator Skeleton Assembled (1/23/10)
- More Right Elevator Skeleton Work (1/21/10)
- Right Elevator Counterweight (1/20/10)
- A Whole Lotta Elevator Work (1/18/10)
- Left, Top Elevator Stiffeners Finished (1/17/10)
- Trim Access Reinforcement Plate Completed (1/16/10)
- More Left Elevator Work (1/14/10)
- Left Elevator Stiffener Work (1/13/10)
- Right Elevator Stiffeners Back Riveted (1/12/10)
- New Tools and Some Workshop Organization (1/10/10)
- Rudder Finished…Finally! (1/9/10)
- Right Elevator Continued, Left Elevator Started (1/7/10)
- Right Elevator Stiffeners Finished 1/4/10)
- Right Elevator Stiffeners (1/3/10)
- Finishing Right Elevator Stiffeners (1/1/10)
- Elevator Stiffeners Rough Cut (12/31/09)
- Black Death (12/30/09)
- New Workshop (12/28/09)
- Four More Rivets In The Rudder (12/9/09)
- 0.1 Hours Worked Is Still Worth a Log Entry (12/7/09)
- More Rudder Final Assembly (12/6/09)
- Continued Rudder Assembly (12/5/09)
- Started Rudder Final Assembly (12/3/09)
- More Rudder Prep (11/29/09)
- Deburring and Dimpling The Rudder (11/28/09)
- Initial Rudder Assembly Finished (11/25/09)
- Initial Rudder Assembly (11/24/09)
- Back-Riveted Rudder Skins (11/22/09)
- A Day of Deburring and Dimpling (11/21/09)
- Finished Half of the Rudder Stiffeners (11/19/09)
- Cut and Final Drilled Rudder Stiffeners (11/18/09)
- Started Rudder Stiffener Fabrication (11/17/09)
- Vertical Stabilizer Completed (11/14/09)
- Only the Rear Spar Remains…Again (11/13/09)
- Two More New Tools
- Vertical Stabilizer Rear Spar and Skeleton Assembled (11/12/09)
- Vertical Stabilizer Rear Spar Prepped For Assembly (11/11/09)
- Vertical Stabilizer Deburring, Dimpling, Priming (11/9/09)
- Starting Final Prep On the Vertical Stabilizer (11/8/09)
- Starting the Vertical Stabilizer (11/7/09)
- The Tool Box Flies! (11/6/09)
- Only the Rear Spar Remains (11/5/09)
- New Tools (sort of)
- Finished Left Horizontal Stabilizer and Making Good Progress On the Right (11/1/09)
- Starting To Rivet the Left Horizontal Stabilizer Skin (10/31/09)
- Left Horizontal Stabilizer Assembly Started (10/29/09)
- Horizontal Stabilizer Skins Dimpled and Primed (10/28/09)
- Horizontal Stabilizer Front Spar Finished (10/27/09)
- Horizontal Stabilizer Rear Spar Finished (10/26/09)
- Horizontal Stabilizer Final Assembly Started (10/25/09)
- Finishing Up The Horizontal Stabilizer (10/24/09)
- Pneumatic Squeezer
- Prepping the Horizontal Stabilizer For Assembly (10/23/09)
- The Horizontal Stabilizer Is Ready To Be Prepped and Primed (10/22/09)
- Second Verse, Same As The First (10/20/09)
- More HS Work (10/18/09)
- More Work on the Left HS (10/9/09)
- Horizontal Stabilizer Confusion (10/7/09)
- N714EJ Reserved (10/6/09)
- More HS Front Spar Work and Rib Prep Started (10/4/09)
- HS Front Spar Work (10/2/09)
- HS Rear Spar Continued, Front Spar Started (10/1/09)
- HS Rear Spar Work (9/30/09)
- Empennage Kit Arrives (9/29/09)
- Tool Box Project Complete (9/26/09)
- And So It Begins… (9/24/09)
- Tool Box Practice Project Continued (9/17/09)
- Tool Box Practice Project (9/12/09)
- Workshop Setup Complete…Almost (9/11/09)
- I Have The Tools, I Can Build It! (9/2/09)
- Tool Kit Ordered (8/31/09)
- Second Workbench Built (8/30/09)
- First Workbench Built (8/27/09)
- Air Compressor Purchased (8/22/09)
- Tools??? (8/14/09)
- Tool Chest Purchased (8/3/09)
- EAA Sportair RV Assembly Workshop (6/13/09 – 6/14/09)